Power at Oroville
We hired Harold Balaz to do the septic and the power. The day he brought
our septic tank and buried it, he also dug a hole for the power pole, which he
erected, and installed the breaker box.
The transformer was a separate item, which I had to purchase. It was around
2500 dollars.
This is the day they installed the transformer, and the meter, and applied
power.
P.G.&E.
![](oropwr_files/image002.jpg)
![](oropwr_files/image004.jpg)
![](oropwr_files/image006.jpg)
![](oropwr_files/image008.jpg)
![](oropwr_files/image010.jpg)
![](oropwr_files/image012.jpg)
![](oropwr_files/image014.jpg)
Putting in the grounding rod with a hammer drill.
![](oropwr_files/image016.jpg)
![](oropwr_files/image018.jpg)
![](oropwr_files/image020.jpg)
![](oropwr_files/image022.jpg)
![](oropwr_files/image024.jpg)
![](oropwr_files/image026.jpg)
![](oropwr_files/image028.jpg)
![](oropwr_files/image030.jpg)
Bob and I went up and hooked the well up to 220.
END